Gurgaon Rapid Metro

Gurgaon Rapid Metro: Information, Route Maps & Project Updates

AN OVERVIEW

Gurgaon Metro Rail Project is the world’s first fully privately financed metro system. It is a single Line Metro with 11 stations.

This system is built and operated by Rapid Metro Gurgaon Limited, a company of Infrastructure Leasing & Financial Services (IL&FS).

The phase-I project with a distance of 5.1 km connects the Delhi Metro’s Sikanderpur Station.

Operational Line of Gurgaon Metro

  • From – Moulsari Avenue – Sector 55-56 (Line-1)
  • Total Distance – 12.1 km
  • Station Type – Elevated
  • Phase 1 Station Names: Sikanderpur – DLF Phase 2 – Vodafone Belvedere Towers – IndusInd Bank Cyber City – Micromax Moulsari Avenue – DLF Phase 3
  • Phase 2 Station Names: DLF Phase 1 – Sector 42-43 – Sector 53-54 – Sector 54 Chowk & Sector 55-56

Proposed Lines of Gurgaon Metro

New Line: Stations (25): Sector 45 – Cyber Park – Sector 46 – Sector 47 -Sector 48 – Technology Park – Udyog Vihar Phase 6 – Sector 10 – Sector 37 – Basai – Sector 9 – Sector 7 – Sector 4 – Sector 5 – Ashok Vihar – Sector 3 – Krishna Chowk – Palam Vihar Extension – Palam Vihar – Sector 23A – Sector 22 – Udyog Vihar Phase 4 – Udyog Vihar 5 & Cybercity.

New Line 

  • Phase 1: Gurugram Railway Station – Panchgaon in Manesar with a distance of 35 km
  • Phase 2: Panchgaon – Dharuhera with a distance of 22 km
  • Phase 3: Dharuhera – Manesar Bawal Investment Region with a distance of 25 km
  • New Line from Gurgaon – Faridabad with a distance of 31 km
  • New Line from Sector 21 Dwarka – IFFCO Chowk Gurgaon with a distance of 12.225 km
  • New Line from HUDA City Centre – Gurugram Railway Station with a distance of 11.15 km
  • New Line from HUDA City Centre – Dwarka with a distance of 27.48 km
  • Line-1 Extension from Sector 55/56 -Vatika Chowk with a distance of 6.34 km

Contractors of Gurgaon Metro line-1

  • Siemens – Signaling and Power systems
  • DMRC  –  General Consultant
  • Thales – Automatic Fare Collection system
  • IL&FS Engineering and Construction Company Limited – Design and construction of elevated viaducts and the six stations
  • Fibcom – Communications Systems
  • CRRC Zhuzhou on a subcontract from Siemens – Rolling Stock