Bangalore Metro

Bangalore Metro: Information, Route & Maps Project Updates

AN OVERVIEW

Bengaluru Metro is also known as Namma Metro is a type of Mass Rapid Transit system. It is India’s fourth-longest operational metro network. This Metro project consists of two colour code lines including 40 stations with a distance of 42.42 km.

Average of daily ridership is around 400,000 passengers.
The Phase-II is expected to complete by 2023 and operation between Electronic city-Whitefield.

BMRCL is a Joint Venture of Government of India and Government of Karnataka

Phase-I of Bengaluru Metro

  • The total cost of the project – Rs 11,609 crore
  • Stations – 41
  • Total distance – 42.42 km
  • Number of corridors – Two

CORRIDOR-I

  • Purple Line – Baiyyappanahalli – Mysore Road
  • Total Length – 18.22 km
  • Covering Stations – 17
    (Baiyyappanahalli – Swami Vivekanand Road – Indiranagar – Halasuru – Trinity – Mahatma Gandhi Road – Cubbon Park – Vidhana Soudha – Sir M Visveshwaraya – Majestic – City Railway Station – Magadi Road – Hosahalli – Vijayanagar – Attiguppe – Deepanjali Nagar – Mysore Road)

CORRIDOR-II

  • GreenLine – Nagasandra – Yelachenahalli
  • Total Length – 24.20 km
  • Covering Stations – 24
    (Nagasandra – Dasarahalli – Jalahalli – Peenya Industry – Peenya – Goraguntepalya – Yeshwanthpur – Sandal Soap Factory – Mahalakshmi – Rajajinagar – Kuvempu Road – Srirampurea – Sampige Road – Majestic – Chickpet – Krishna Rajendra Market – National College- Lalbagh – Southend Circle – Jayanagar – Rashtriya Vidyalaya Road – Banashankari – Jayaprakash Nagar – Yelachenahalli)

Operational Lines (Phase I & II): 42.42 km

  1. Purple Line (Baiyappanhalli – Mysore Road) – 18.22 km (17 Stations)
  2. GreenLine (Nagasandra – Yelachenahalli) – 24.20 km (24 Stations)

Under-construction Lines (Phase 2 & 2A): 91.44 km

  1. Purple Line (Mysore Road – Whitefield) – 24.31 km (19 Stations)
  2. GreenLine (Yelachenahalli – BIEC) – 10.06 km (8 Stations)
  3. Yellow Line (R V Road – Bommasandra) – 18.82 km (16 Stations)
  4. Pink Line (Gottigere – Bangalore Airport) – 21.25 km (18 Stations)
  5. Blue Line ORR Metro (Central Silk Board – K. R. Pura) – 17 km (13 Stations)

Some Major Tenders for Metro Phase-II are:

  1. Construction of Elevated viaduct from Mysore station-Pattanagere station – Joint Venture of IL&FS-ECC Ltd
  2. Construction of Elevated viaduct from Puttenahalli cross station-Anjanapura Township station – NCC Ltd
  3. Construction of Elevated viaduct from Pattanagere station from the starting of Challagatta Depot – Soma Enterprise Ltd.